Precast system has chosen as main structure in a new St. Carolus Hospital building, in Salemba-Jakarta.
St. Carolus Hospital new building will incorporate a car park facility on three basement levels and eight level floors as medical facilities with total floor area is a 24,345 m2. The main structure is using precast half beam, precast column and Hollow core slab as flooring system. All precast building is produced in WIKA Beton Concrete Plant at Bogor West Java. The column beam connection system known as Precast Seismic Structural System
This building is constructing in a active hospital complex which demand less air pollution, noise and waste in construction site. Precast offers a safer and healthier working.